• Men's Watch Ben Sherman WBS112UT (Ø 44 mm)
  • Men's Watch Ben Sherman WBS112UT (Ø 44 mm)

Men's Watch Ben Sherman WBS112UT (Ø 44 mm)

€76.54
Tax included

 

Security warranty

 

Shipping information

  Return policy

15 days

If you like keeping up with the latest fashion and accessory trends, buy Men's Watch Ben Sherman WBS112UT (Ø 44 mm) at the best price.

  • Gender: Men
  • Extra links: No
  • Type of watch: Wristwatch
  • Bracelet material: Leather
  • Watch Case Material: Steel
  • Type of movement: Quartz
  • Crystal: Mineral
  • Water resistance: 3 atm
  • Includes: Includes the brand's case
  • Type of fastening: Buckle
  • Watch face colour: Blue
  • Watch case colour: Silver
  • Strap colour: Brown
  • Watch case diameter: Ø 44 mm

  • Brand
  • Reference
    S0376294
  • In stock
    999 Items
  • Condition
    New
  • EAN13
    5024693163441

Comments (0)

Loading...